non-residential products

solid line DX

Trims / Joints / Substrate Materials

Ideal for food processing plants and clean rooms. A large‑radius baseboard material that solves the issue of long installation times associated with conventional concrete baseboards. Designed with both impact resistance and hygiene in mind.
Dry construction method enables a shorter installation period.
High impact resistance protects walls from collisions with carts and trolleys.
Floor coating can be applied directly to the product surface, and as there are no internal cavities, it supports a high level of hygiene in factory environments.

  • Installation Manual
  • Solid Line/ Solid Line DX – Catalogue
  • Plantool Catalogue
  • General Catalogue

Do you face the following issues when installing cast-in-place concrete skirting?

What is concrete skirting? Concrete skirting is a skirting constructed by wet construction methods to protect the finished wall surface.

・Requires many work processes, making labor coordination and material delivery complex and burdensome.
・Construction schedules are difficult to predict, causing pressure on the overall project timeline.
・Requires many materials, raising concerns about damaging finished surfaces and making protection work troublesome.
・Cost estimation is difficult due to hidden and unforeseen costs, resulting in higher project burden.

Solid Line DX was developed as an alternative to
cast-in-place concrete skirting.


This solid, non-combustible R-shaped skirting material is designed for skirting areas (wall-to-floor junctions) in food factories where strict hygiene control is required, making cleaning easier and preventing dirt accumulation.

Solving Problems With Solid Line DX!


Product features

・Impact resistance: A large, molded skirting that protects the building structure from cart impacts.
・Reduced labor and shortened construction time: Simplified installation using a dry method with adhesive-fixed molded products.
・Hygiene consideration: Solid, dense structure designed to prevent insects from nesting behind the skirting.

The DX type significantly reduces construction work volume.

By adopting Solid Line DX, the construction period can be significantly shortened compared to cast-in-place concrete skirting.
(Estimated construction period comparison based on 200m of installation)

Installation Instruction

Solid Line DX Case Studies


8/2023 DX200

Agricultural product processing facility Hokkaido 365m

2/2023 DX200

Building facility Shizuoka Prefecture 18m

2/2023 DX300

Retort food manufacturing plant Aomori Prefecture 40m

7/2033 DX200

Seafood processing plant Miyagi Prefecture 56m

7/2022 DX200

Confectionery factory Fukuoka Prefecture 546m

3/2022 DX200

Private catering center Osaka Prefecture 122m